Project Description:The capability to sense incoming waves and actively absorb them was the significant deliverable in this project. The test set up included a wave flume with wave generators at each end. The measured resuls from the wave absorbing controller were significantly superior to other controllers.Deliverables:
Technologies:
Click here to link to the web site
for the NRC Canadian Hydraulics Centre. |